We extended the existing house to the west, and aligned it with the setback line. The added interior spaces provides a larger Master Closet, a master shower and a larger Guest Bedroom. To create a floating effect, for support we used the existing west foundation walls, and cantilevered the structure with (4) 4x4 steel posts.
Showing posts with label Before/After. Show all posts
Showing posts with label Before/After. Show all posts
Thursday, May 15, 2014
Friday, May 9, 2014
Tuesday, May 6, 2014
Before & After - Main Entry
The construction of the garapa entry porch is almost complete and the custom pivot teak door will be installed by the end of this week.
| Main entry - Fall 2012 |
| Main entry - April 2012 |
Labels:
Before/After,
Existing,
Images,
New
Before/After - Front facade
Before & after front facade.
| Front facade last year - before the construction started |
| Front facade this week - during construction (05.05.14) |
Labels:
Before/After,
Existing,
Images,
New
Friday, May 2, 2014
Before/After Crawl Space & basement access
The existing house had a very small access to a shallow crawl space. The HVAC unit & HWH were barely accessible.
Labels:
Before/After,
Existing,
Materials,
New
Subscribe to:
Posts (Atom)


