Thursday, July 25, 2013
Monday, July 22, 2013
Friday, July 19, 2013
Bathroom Floor
The new wood structure is installed to replace the "existing" destroyed structure. See post: http://ranchstyleredux.blogspot.com/2013/05/bathroom-floor.html?spref=fb
Labels:
Construction,
Existing,
New
Tuesday, July 16, 2013
Tuesday, July 9, 2013
During construction
To provide access for the new Mechanical Room, part of the existing footings will be removed. Prior to cutting and removing this area, the new footings and foundation walls will be installed and will support the existing footings on each side of the opening.
Labels:
Construction,
Existing,
Images
Monday, July 8, 2013
Rain vs. Excavation
If you are driving by the site it may look like we are building a green house, but the plastic is just there temporarily to provide protection from rain for the excavated crawl spaces and future footings.
Labels:
Construction,
Existing,
Images