The crew is installing the garapa trellis today! We used steel tubes & plates as a support frame and the garapa trim was precut and sealed prior to installation.
Showing posts with label Structure. Show all posts
Showing posts with label Structure. Show all posts
Thursday, May 22, 2014
Thursday, May 15, 2014
Details: cantilevered west addition
We extended the existing house to the west, and aligned it with the setback line. The added interior spaces provides a larger Master Closet, a master shower and a larger Guest Bedroom. To create a floating effect, for support we used the existing west foundation walls, and cantilevered the structure with (4) 4x4 steel posts.
Friday, May 9, 2014
Friday, April 18, 2014
Garapa deck
Rainy day on the job site today. The Garapa decking is almost complete, the steel structure for the Garapa trellis is in place, and next week the railing will be installed.
Deck, views, backyard
Even on a gloomy, rainy day like today the views from all over the house are still beautiful
![]() |
View from the Living Room towards the backyard |
![]() |
View from the Office towards the deck through the double sliding doors |
Wednesday, March 5, 2014
Monday, February 3, 2014
February 2014
The attached image compares the back side of the house when we started in 2012, to how it looks now. As you can see, the cantilevered extension in the back of the house is almost completely enclosed and the concrete curb & footings for the deck are being poured this week. The entire south facade was opened with storefront windows so the Owners can enjoy the beautiful views of the woods from any location in the house.
Labels:
Construction,
Existing,
New,
Structure,
Woods
Friday, January 17, 2014
Subscribe to:
Posts (Atom)