Tuesday, May 6, 2014

Before/After - South Facade

The deck & storage are almost complete. The new large windows open the house to the backyard.


Before/After - Front facade


Before & after front facade.
Front facade last year - before the construction started
Front facade this week - during construction (05.05.14)

Kitchen Cabinets

We designed the new kitchen cabinets to fit the Owner's needs complete with Hafele inserts for a custom look. The cabinets are made out of plywood with teak veneer on exposed doors, drawings and edges to match the existing furniture.

Can't wait to share the final product!


Fold-away bracket from Hafele



Friday, May 2, 2014

Before/After Crawl Space & basement access

The existing house had a very small access to a shallow crawl space. The HVAC unit & HWH were barely accessible. 

For the new design, the Owner got a full height gardening area below the addition, we dug out part of the crawl space to create a full height mechanical room, and cleaned the rest of the crawl space and covered it with gravel and protection membrane.

Existing crawl space access
New Basement access


Thursday, May 1, 2014

Before/After - Deck

The new deck extends almost the entire length of the house and overlooks the beautiful backyard.

Existing South Facade

New South Facade - Oversized Deck

Before/After - Under the deck storage

The existing storage area under the deck was hard to access, shallow and not waterproofed. The new under the deck storage, is easily accessible, has a clearance height ranging from 5'4" to 4'6", and it's waterproofed.


Existing storage access
Existing under the deck storage

New under the deck storage

Before/After

The renovation of the house will be complete by the end of this month. Looking back at the pictures we took two years ago it's impressive to see the difference between the ranch house we started and the end result. For the next few weeks, I will post a lot of before and after pictures for your review.

First one is for the deck stair.

We used 2x 6 garapa lumber for the treads and  2x 2 garapa trim for the louvers around it. The steps will have LED strips under and a new metal railing that will be installed next week.

Before - Stair from the backyard to landing

Before - Stair from landing to deck

New stair during construction