Friday, December 13, 2013

The aluminum storefront frames are installed in both the Living Room and Bonnie's Room. The views of the backyard woods from these two rooms are spectacular.



Garage glass block opening

The Garage glass block opening is complete. The solution provides both natural light into the garage and privacy.


HVAC System

A picture of the 12" round ERV fresh air intake or exhaust grill. You will notice (2) on the west facade hidden beneath the cantilevered addition.


Garage glass block opening

Scott & Marlin working on the Garage glass block opening. Note the yellow line, that's because we want everything to align perfectly.



Monday, November 18, 2013

Friday, November 15, 2013

Openings

The openings are framed and ready for the storefronts to be installed.


Tuesday, September 17, 2013

Street Elevation

The attached image compares the street elevation view from last fall during design phase and last week, during construction phase. The existing driveway & brick veneer have been removed and the demolition of the roof is underway. The new geothermal wells are installed underground in the front yard, the garage concrete slab has been poured and the extensions for the Master Bedroom & Office / Laundry Area are built.